Diseño e Ingeniería

of projected pipelines in operation

+ 0 kms

Capabilities

professionals in multiple disciplines

+ 0

Trayectoria

de experiencia en ingeniería

+ 0 Years

Explore our projects

Engineering and Design

El Proyecto Básico del Sistema de Captación de Agua en el Arroyo Monjolos, ubicado en la Mina de Água Limpa (Complejo Minas Centrais), en Minas Gerais, fue desarrollado por BRASS en 2025 con el objetivo de optimizar el abastecimiento hídrico de la planta, garantizando la continuidad operacional.

Engineering and Design

El proyecto desarrollado por BRASS contempló el desarrollo de la ingeniería básica de un sistema electromecánico para la segregación y drenaje de aguas pluviales en las Fajas 5 y 6 del DSR1 de HYDRO Alunorte, como parte de su compromiso con la gestión ambiental y las prácticas operacionales sostenibles.

Engineering and Design

The project, located in Puno, sought to implement a structural fill solution that would allow the exploitation of new reserves and the underground disposal of tailings, aligning with the operational objectives of the San Rafael Mining Unit and the Nazareth Project.

Asset Integrity

The main objective of the project was to investigate the accelerated wear and cracking events that occurred in the dissipation station of the Toromocho Mining Unit's Tailings Transport System. As a result of the analysis, recommendations were formulated to strengthen the Pipeline Integrity Management System, implement quality controls in the acquisition and manufacture of special parts, update the hydraulic models (Steady State) with current rheological conditions, and conduct failure tests (expert analysis) on the removed components to confirm the hypotheses. It is also suggested that dynamic flexibility analyses be performed and the correct installation of anti-vibration mounts be verified on-site to prevent future events that could compromise operational continuity and the safety of the facilities.

Building new paths through engineering

Check out this space where we share experience and knowledge

BRASS Engineering present in Asia

Our hydraulic engineering and mineral processing team from BRASS Brazil, with the support of WeiWei Yao, an engineer from BRASS China, visited and supported a series of procedures in Changsha, China.

June 18, 2026
BRASS celebrates 25 years of history with an agenda that combined experience, knowledge and camaraderie

The year 2026 marks a significant milestone for BRASS and for all the people who have been part of its growth and consolidation in the global industry.

April 19, 2026
BRASS 2026 Technical Seminar in Chile

On April 16th, a Technical Seminar organized by BRASS was held in Chile, one of the many activities of this year 2026 related to the commemoration of the 25 years of existence of the company at a global level.

April 16, 2026